SOLVING CONVEYING PROBLEMS
All projects are important and have qualities that bring a great deal of satisfaction once in operation. The following are case histories that US Systems had the pleasure of completing over the last three decades.
| Cement |
| Problem: |
Break this cement company's unloading time barrier. |
 |
| Solution: |
Designed and installed an in-plant system that moves cement from covered hopper cars to storage and from storage to mixer at a rate of one million pounds per day. A separate system for pneumatic trailers to a 70 foot high silo moves 150,000 pounds per hour using 60 horsepower. |
| Results: |
Customer increased production dramatically. |
| Coffee |
| Problem: |
How to move up to one million pounds of beans a day with a 30 month payout? |
 |
| Solution: |
A custom designed vacuum system was installed that handled 72,000 pounds per hour to transfer in-plant and 90,000 pounds per hour to unload truck trailors. This represented a 20% increase over specifications. |
| Results: |
Customer experienced a payout in less than the required 30 months. |
Home | Truck Unloading | Rail Unloading | Inplant Transfer | Motor Blowers
Bulk Bag Filling | Engineering Services | Partial Materials List
Solving Conveying Problems | Dense/Dilute |
Hopper Adapter | Vibracone
Intermodel Transfer Portable Conveying | E-mail USS | RFP
|